Development pipeline

Our development pipeline.

Seven battery and solar projects span South Australia, New South Wales, Queensland, Western Australia and Victoria, at different stages of development. Explore the portfolio, development milestones and opportunities to work with Risen’s Australian team.

  • 7 Development projects
  • 745 MW Battery power
  • 2.43 GWh Battery energy (base configurations)
  • 565 MW / 713.2 MWp New solar capacity
  • 5 States (SA, NSW, QLD, WA, VIC)

Projects

Showing 7 of 7 projects

Solar & storage across Australia

  • Artist’s impression of the Bungama West battery energy storage project in South Australia Battery storage SA Available for acquisition
    Artist’s impression

    Bungama South Australia

    Bungama West BESS

    Battery power
    200 MW
    Battery energy
    400–600 MWh

    2–3 hours storage duration

    Construction-ready

    1. Land secured — complete
    2. Development approval — complete
    3. Grid connection (5.3.4A clearance) — complete
    4. Construction — upcoming
    Project details

    Risen Energy Australia invites expressions of interest for the acquisition of Bungama West BESS, a construction-ready, fully consented development; co-development or investment proposals will also be considered. The 200 MW / 400–600 MWh project is near Port Pirie in the Mid North, South Australia, with 2 to 3 hours of storage configurable to the offtake. Freehold land, development consent and AEMO Section 5.3.4A clearance are secured. ElectraNet is positioned to issue an Offer to Connect, ahead of a Transmission Connection Agreement and construction.

    Location
    Bungama, near Port Pirie — Mid North, South Australia
    Storage duration
    2 to 3 hours, configurable to the offtake
    Process
    Expressions of interest invited for acquisition; co-development or investment proposals also considered
    Tenure
    Freehold land owned outright by Risen Energy Australia
    Approvals
    Development consent obtained; AEMO Section 5.3.4A clearance received
    Next step
    ElectraNet positioned to issue an Offer to Connect, ahead of a Transmission Connection Agreement
    Discuss this opportunity
  • Concept illustration of a small fenced battery compound beside solar arrays in open grazing country below low hills Solar + storage NSW Available for acquisition
    Concept illustration · indicative only

    Hillston New South Wales

    Hillston Solar Farm + BESS

    Battery power
    5 MW
    Battery energy
    10–20 MWh

    Solar: 4.998 MW / 7.2 MWp

    Construction-ready

    1. Land secured — complete
    2. Development approval — complete
    3. Grid connection — complete
    4. Construction — upcoming
    Project details

    A compact solar and battery hybrid near Hillston in the Riverina, pairing a 4.998 MW / 7.2 MWp solar farm with a 5 MW / 10–20 MWh battery for two to four hours of storage. Development approval is in place and the grid connection agreement has been executed, so the project is now progressing towards construction.

    Location
    Hillston — Riverina, New South Wales
    Storage duration
    2 to 4 hours
    Discuss this opportunity
  • Concept illustration of Woodland battery storage in a flat Riverina agricultural landscape Battery storage NSW
    Concept illustration · indicative only

    Darlington Point New South Wales

    Woodland BESS

    Battery power
    250 MW
    Battery energy
    1,000–3,000 MWh

    4–12 hours storage duration

    DA approved — grid connection in progress

    1. Land secured — complete
    2. Development approval — complete
    3. Grid connection — in progress
    4. Construction — upcoming
    Project details

    A 250 MW battery in the Riverina, designed to deliver four to twelve hours of storage so the configuration can be matched to the offtake or tolling structure that is ultimately contracted. It is the largest storage project in Risen’s Australian pipeline. Land and development approval are secured; the generator performance standard package for grid connection is now being prepared.

    Location
    Darlington Point — Riverina, New South Wales
    Storage duration
    4 to 12 hours, configurable to the offtake
    Register your interest
  • Concept illustration of solar arrays and battery storage together at Geranium Plains Energy Park Solar + storage SA
    Concept illustration · indicative only

    Geranium Plains South Australia

    Geranium Plains Energy Park

    Battery power
    150 MW
    Battery energy
    300 MWh

    Solar: 250 MW / 343 MWp

    DA approved — grid connection in progress

    1. Land secured — complete
    2. Development approval — complete
    3. Grid connection — in progress
    4. Construction — upcoming
    Project details

    A 250 MW / 343 MWp solar farm and 150 MW / 300 MWh battery on a single approved site in South Australia’s Mid North, with room to expand both the solar and storage capacity.

    Location
    Geranium Plains — Goyder region, Mid North, South Australia
    Register your interest
  • Concept illustration of battery storage added beside Yarranlea solar arrays Solar + storage QLD
    Concept illustration · indicative only

    Yarranlea Queensland

    Yarranlea BESS retrofit

    Battery power
    60 MW
    Battery energy
    240 MWh

    Solar: existing 120 MWp

    Development approved — grid connection package ready for submission

    1. Land secured — complete
    2. Development approval — complete
    3. Grid connection — in progress
    4. Construction — upcoming
    Project details

    An operating solar farm. A new role in powering the digital economy. This retrofit pairs Yarranlea’s existing 120 MWp solar farm with a 60 MW / 240 MWh battery to create a solar + storage hybrid with four hours of storage. For data centre developers seeking renewable power beyond daylight hours, it offers an opportunity to explore a hybrid energy offtake matched to their demand. Development approval for the battery is complete, and the grid connection package is ready for submission.

    Location
    Yarranlea — Darling Downs, Queensland
    Storage duration
    4 hours
    Register your interest
  • Concept illustration of large solar arrays and a fenced substation among bushland and hills Solar + storage WA
    Concept illustration · indicative only

    Benger Western Australia

    Benger Solar Farm

    Battery power
    80 MW
    Battery energy
    480 MWh

    Solar: 105 MW / 130 MWp

    DA approved — grid connection in progress

    1. Land secured — complete
    2. Development approval — complete
    3. Grid connection — in progress
    4. Construction — upcoming
    Project details

    A 105 MW / 130 MWp solar farm with an 80 MW / 480 MWh battery, giving six hours of storage to shift daytime solar into the evening peak. The project spans about 187 hectares near Harvey in Western Australia’s South West. The solar farm holds development approval and a grid access contract for connection to the South West Interconnected System.

    Location
    Benger, near Harvey — South West, Western Australia
    Storage duration
    6 hours
    Register your interest
  • Concept illustration of solar arrays among paddocks and gum trees in central Victoria at sunset Solar VIC
    Concept illustration · indicative only

    Campbells Forest Victoria

    Campbells Forest Solar Farm

    Solar capacity
    205 MW
    Solar DC
    233 MWp

    Development approved

    1. Land secured — complete
    2. Development approval — complete
    3. Grid connection — upcoming
    4. Construction — upcoming
    Project details

    A 205 MW / 233 MWp solar farm on about 360 hectares in the Loddon Shire, around 20 km north-west of Bendigo in Victoria. It has development approval, with grid connection and battery storage planned as the next steps.

    Location
    Campbells Forest, near Bendigo — Loddon Shire, Victoria
    Register your interest

Development capacities are shown by project. The battery-energy total above uses the base configurations; final duration depends on project configuration and offtake.

How a project gets built

Four stages from paddock to grid.

  1. 01

    Land secured

    Long-term lease or purchase rights over the site, with environmental and cultural-heritage assessments complete.

  2. 02

    Development approval

    State planning approval for the project as designed — the permit to build, subject to conditions.

  3. 03

    Grid connection

    Generator performance standards agreed with the network and AEMO, culminating in the Section 5.3.4A letter and an offer to connect.

  4. 04

    Construction

    Connection agreement executed, equipment procured and works under way through to commissioning and registration.

What’s on offer

Ways to get involved.

Each project can be taken on outright, developed jointly, or backed as an investment. Risen’s Australian team stays on to see it through.

  • Acquisition

    Take the project on and carry it through construction to operation.

  • Co-development

    Partner with Risen’s Australian development team through connection, procurement and delivery.

  • Investment

    Fund development or construction alongside a developer that has built and operated solar farms in Australia.

  • Supply-backed

    Risen can supply the modules and battery systems, with local warranty and support — the same equipment behind its operating Australian assets.

Register interest in a pipeline project.